LP-CUR-M1-L9 | Motus Transition Checklist
LAUNCHPATH TRANSPORTATION EDU  /  LP-CUR-M1-L9AUTHORITY PROTECTION · MODULE 1

MOTUS TRANSITION CHECKLIST

10-Step Monthly Verification — Run at the same time as your IFTA quarterly prep.

SECTION A — PORTAL & ACCOUNT
#ITEMREQUIREMENT / DETAIL
01
Portal login activeLog into portal.fmcsa.dot.gov. Confirm account is active, not disabled or archived.
02
Company Official verifiedOwner or employee — not a consultant or third-party service. Must match Login.gov.
03
Login.gov email matchedEmail on Portal account matches Login.gov account for Company Official exactly.
04
MFA enabledMulti-factor authentication active on Login.gov account.
05
Backup Official designatedSecondary person assigned in case primary Official is unavailable.
SECTION B — DATA & FILINGS
#ITEMREQUIREMENT / DETAIL
06
MCS-150 currentBiennial Update filed within last 24 months. Address, fleet count, and contacts current.
07
Physical address verifiedStreet address on file is inspectable. No PO Boxes. No virtual offices.
08
Fleet count auditedVehicle count in FMCSA records matches actual equipment.
09
BOC-3 status confirmedVerified active at safer.fmcsa.dot.gov. Provider still registered and operating.
10
FMCSA alerts activeSubscribed to FMCSA email alerts. Phase 2 invitation will arrive via email — do not attempt Motus access before it arrives.

OPERATING INSTRUCTIONS

Owner: Company Official — the person designated on the FMCSA Portal account.
Frequency: Monthly. Run at the same time as IFTA quarterly prep. This checklist will be wired into the LaunchPath recurring admin calendar in Module 3.
Important: Do not create a Motus account until FMCSA sends the Phase 2 carrier invitation. Until then, all filings remain in the legacy system.

LP-CUR-M1-L9 | Motus Transition Checklist | Authority Protection
LaunchPath Transportation EDU | launchpathedu.com
Cohort use only
Not for redistribution